Monday, February 27, 2012

tile work progresses.

 Master Bathroom: The shower walls have been set in place, shower floor has been tiled and grouted, slate floor tiles have been laid and grouted, and the tile work in the shower and around the tub is progressing.
 Kids' Bathroom:  Only a few finishing tiles and grout are needed to complete the downstairs bathroom.
Basement Office Room:  Did we mention that Mike felt that his desk would feel too cramped in the Reading Room on first floor (formerly Tom's Smoking Room)?  We got the brain child to use the "extra room" off the laundry area as Mike's Office.  He is totally jazzed about this.  The electrical box that he designed is in the room for him to admire, and only until you set foot in our basement will you understand how sunny & cheery the basement is because of the high ceilings and large windows.  We also used the extra rugged & adventurous colored slate tiles (that were not the desired look for the Master Bathroom) to tile Mike's Man Cave. The look is pretty spectacular.

Our tile setters plan to finish up this week which will be very exciting. 

No comments:

Post a Comment