Carpenter Dave Grimm spent the bulk of his second week on the job reinforcing the master bathroom floor in preparation for the weight of the whirlpool tub, shower and tile work. You can see from the BEFORE photo (bottom) that huge chunks had been taken out of the floors joists weakening the floor. Mike is thoroughly impressed with the way that Dave reinforced the walls from basement to the second floor.
Dave also measured and ordered new Pella windows for the kitchen, both bathrooms and mudroom porch. After months of demo work, you can imagine how exciting this is for us.
I trust you are aware of the mold infestation above the top picture. It is easier to fix now rather than later. I hope Mike's health is not compromised working around such to toxic spores. E
ReplyDelete